Shop Talk for
Z-Car enthusiasts!

Click here to go to the Z Car Garage home page...Click here to go to the Z Car Blog home page...
Performance Parts for Nissan, Inifiniti and Datsun Cars
Search:

Behemoth Update: The RB Builds Continue!

Filed under: Featured Cars and Projects
by Forbes @ 8:00 pm on July 29, 2009

Here are the latest happenings with the Behemoth RB28 monster.  As most of you know the car came back from paint a few weeks ago and now we have all of the suspension removed and being prepped for powder coating.  Every single part has been removed from the body and will be restored or customized as needed.  The struts will soon be shortened and the coil-overs installed.  The struts will then be sent out along with the rest of the suspension and bracketry to be powder coated high-gloss black.

Besides powder coating, all of the hardware for THE ENTIRE CAR has been labeled and sorted and will soon be going out to be freshly zinc plated.  All hardware that is too corroded to be restored into perfect condition is set to be replaced.

While these parts are out getting fixed up, we at ZCG will be organizing and setting up our final game plan for the installation of the interior.  We will also be preparing the underbody for the final undercoating which we will be doing at the shop.  The undercoating that we use is topnotch and will definitely stand up to the abuse this car will surely see on and off the track.

The more we plan ahead the quicker the amazing project will be finished, and that is the ultimate goal.  We want this car in the hands of it’s loving owner as soon as possible

REMEMBER: These are the BEFORE pictures.  You won’t believe how different the underside of the this care is going to look in a few short weeks.  Enjoy the pictures here of the dissassembly of the car, and I will have more photos of the freshly restored parts in a few weeks.


Related Articles

No user responded in this post

Subscribe to this post comment rss or trackback url